The stucco patching began today. He's patching the old electrical meter location in the picture. The new stairs are also ready for concrete which will happen tomorrow if it doesn't rain.

This is what our back deck looks like right now, I've completely given up cleaning. The stucco guy was just about to start repairing the old door location.

A close up of the stucco patching of the old back door. New building paper and welded wire mesh.

The new hardwood flooring in the upstairs bedroom.

The first exterior window trim for our approval, it failed. Just a couple of things. Firstly the flashing is too large (so he's ordering a smaller one that will look neater), the top trim peice is being enlarged to overhang the sides by 1" and finally he wasn't supposed to be installing trim. It was funny as our contractor phoned to tell me the first window had been done and if I wanted to take a look at for approval. So I ran over and phoned Myles to let him know what the window installer had done and in the process Myles inquired why they were even installing window trim....as we haven't had the house painted yet. The exterior painting quote was based on no trim (cheaper) so I had to phoned him and begged him to not increase his quote but still allow us to put the trim on as I hate sending trades home when they are there to work. And he didn't.

Sanding of the stairs.

Dirty bathtub....

Clean bathtub.....It's in good shape for being sixty four years old.

the tile looks great!!!
ReplyDeletehey, i think paul, hugo and i will be through in september - one wedding in toronto, another the following weekend in victoria... i'll keep you posted.
but the tile looks great!!!!