The deck is almost complete in this picture. I can't keep up with the construction as the deck is now complete, I'm a couple of days behind. The cedar decking smells wonderful I wish the deck would smell like that forever but it won't. The deck is a great size, now that's it finish we can stand on it and figure out where to put things and figure out landscaping etc.



The main floor is almost completely drywalled now. We have had to add some drywall here and there (1/4") on existing walls as construction really did alot of damage. With all the drilling and hammering the house was shook up at bit which is not good for old plaster. So some walls were just too cracked. So they are just putting an sheet of 1/4" (usually they use 1/2") on top. Looks very different after drywall. You get so use to seeing it open and then suddenly it's closed off. They have started upstairs as well but haven't taken pictures yet.


One of the splurges for the house was a new tankless hot water heater, hot water on demand. Very excited to never run out of hot water. And will help out on our gas bills as we don't have to keep a tank full of water hot now. This installation cause a bit of a fiasco as I showed up one morning and there is a big vent on the front of the house. Again bascially an issue of trades not talking to each other and just installing stuff without any thought to asethetics or client opinion. So I freaked out...nicely. There is a basement slider window (openable) right by the location where the tankless hot water heater was going to be installed. The venting for the tank has to be a certain distance from an openable window. So when the installer was there he saw the basement window and went ahead and installed the vent out the front of the house. Unfortunately the builder and Myles and I had already discussed this window (as all four basement windows were ordered incorrectly) and that when they ordered new windows we were going to order than particular one as a fixed window (unopenable - is that a word?) We were prepared to pay for that window (would have been cheap) but since it was never communicated to the plumber we have told our builder to either move it (which I don't think will happen) and we will still cover the cost of the new window or he leaves, plants some landscaping around the vent outside and we don't cover the cost of that window. Confusing I know.


Other than that, drywall, taping and mudding happens all this week. Probably the new front porch as well. Next weekend we will be painting as much as we can before kitchen and plumbing fixtures are installed. Next Monday kitchen is installed and appliances arrive, next wednesday is granite templating and flooring begins. And Myles and I are in Vancouver for Tuesday/Wednesday, wow, that's bad timing. Oh well.
That deck looks beautiful!!
ReplyDeleteOooh...blue pipes in...red pipes out...I love coloured plumbing!
ReplyDelete