Wednesday, April 29, 2009

INTERIOR CONSTRUCTION CONTINUES.......

New countertops. Yahhhh! I really like them, very solid black color, supposedly it looks like Corian (I don't really like Corian so that was upsetting but.....whatever). Might look like Corian but it will act like Granite. The new sink is in and we have to do some custom trim around the sink. These new farmhouse style sinks that are popular right now are difficult for the kitchen installer, ours was close but still needs some custom work around it. As for the kitchen we've only paid 50% and were not going to pay anymore until it's absolutely complete. It was a shitty installation. Everything can be fixed but it's just a pain in the butt. We like it but it's still just a pain in the butt. Note: kitchen is still painted the wrong color so ignore that. Still looks purple/blue color.



New insulation was blown in yesterday. They also came and cleaned the attic space up, took away all the old insulation batts and blew in new insulation. It's very fluffy!! I had to go digging through it all because the flooring guys put one of my HVAC covers (one of the original ones that goes with the house) in the attic while they were doing the floors. So the insulation guys just covered it up. So there was a bit of panic until we phoned them asking where it was and I had to go poking around in the attic space to get it. It's been a nightmare trying to keep all the original fixtures that we are re-using safe. I keep finding them all over the house. Frustrating.




More pictures of the new floors. They still get one more buff and seal but it's one of the last things that happens.





So we still have no power, no gas, no toilet, no operable fixtures of any kind and we were supposed to move in in 2 days..........yeah. Right.

The kitchen cabinets were installed so shittily, that the counter top guy had to spend an hour shimming the tops of the cabinets so the countertop would be level. So the kitchen jackasses still have to come in and fix all their f%#k ups.

But it'll all be done next week..........yeah. Right.

We can't move in until we have the final inspections from the City of Kelowna, so that means all the handrails for stairs, all the gas-fitting and plumbing fixtures need to be installed because we ARE moving in next weekend.

But it will all be done next week.........yeah. Right.

My .02 - Mylo

PS. I totally love renovating. ;) but hey, I'm going golfing tomorrow.....so is it really that bad? I think not.

Lata

EXTERIOR CONSTRUCTION CONTINUES....

New front conc. porch right after concrete pour.



Finish exposed aggregate conc. front porch. Still has to come and acid wash it and seal it, which will darken it up.



Front of house still missing railing, trim for windows & doors & paint. But otherwise complete.



Back of the house with the stucco patched, did a very nice job. You can barely tell and especially after we paint it. Stairs/railing are being completed today.



So we are taking occupancy in one week......what a mess!

Monday, April 27, 2009

PUPPIES..SOONER RATHER THAN LATER

This is Gibson...



And this is Gibson..I think...



This isn't Gibson...I think....



These definitely aren't Gibson but they are super cute.




Sorry I take horrible pictures when I'm with puppies, easily distracted.
So our puppy is coming sooner rather than later and for Mylo and I that's not so good. The whole puppy story is quite complex so I hope I get it right. The puppies dad, Luca, is fully papered while the mom, Tori, doesn't have her papers yet. It was an accidental meet and greet that occurred, she didn't want to breed them for another year or so or until Tori was registered. Because she isn't registered the owners of the parent dogs have some very strict legal requirements that she, (Dana) has to follow. At first they wanted the pups aborted (horrible I know, sorry but this story gets worse) but they managed to negotiate some legal requirements so that the pups could live. Every person who buys a pup has to sign a document (with a deposit) that they will be neutered by Dana before released. It's alittle earlier than most people have it done (the absolute min. is 10 pounds). The breeders of the parents are making her have it done at exactly 10 pounds, so she doesn't want to put the pups back together afterwards as they are starting to play rough and will rip each other stitches out. So they have to go to their new homes immediately. So in our case thats Thursday!!!! So not ready. We are going to have to tell Dana to keep the pup at the least the weekend so we can move out of the condo and into the house. Chaos!
Now the sad part. Only three pups are spoken for (three people have backed out! for various reasons) The association in Kelowna that is responsible for rules and regulations on litters (can't remember what it's called) will only allow Dana to keep the pups on her premises for 90 days. The breeders of the parents are not allowing her to place them at the SPCA so they will be put down. So she has asked Mylo and I to foster a puppy (we won't get that one for awhile) so she has more time to find homes if it comes down to that. Ummmm how do you say no to that? She still might be able to get homes, still some time. So we will probably have two at some point and then there will be tears when one leaves. But I have talked to other people who have fostered and you usually glad to have to one go.

Friday, April 24, 2009

LOCKED OUT

Original View from Dining Room to Living (ahh remember that beautiful carpet..)



Next construction...this is actually the view from Living Room to Dining Room but it's still the same floor. What a mess!



Floor being sanded.



Floor after oil wood finish. Couldn't do the acrylic finish (smells way better than the oil) I guess due to the nature of the old floors at least that's what I was told. I didn't want to anyways as the oil finish darkens the wood slightly and the color will age better than with an acrylic finish. Anyways we won't be able to finish these floors again, this is it. We will just have to take care of them, and just put new finish on, there isn't enough to sand them down again.



Floors with the first coat of sealer on it. I think it's still wet, looks so glossy. The house is now empty for two days. And boy does it smell.....but we are not going to be moving in for awhile. May 10th is the move in day (ish). So now that we can't get in the house or do anything on the house this weekend the next blog will be puppies....we get to see them tomorrow. And we get our puppy on May 10th....wow!



Wednesday, April 22, 2009

ANTIQUES

This our first purchase and it was quite a procedure. I bought it from a antique store called Lois Lane (wasn't expensive or anything, just liked it because it was small and thought it would fit in the space). A few people who read this blog will understand this but Lois Lane is the hardest antique store to buy anything from. I picked out the bench (which was alittle beat up) and asked to buy it. Big debate about finishing it etc., she didn't want to let it go without seeing what it would look like refinished but she needed to talk to her son. So I said I would be back. When I came back it wasn't finished, offered to take it as is again, but again he (the son this time) wanted to finish it. so we again agreed on a price and that they would call when done. It's just a little wooden bench so I wasn't too picky on what he wanted to do to it. So went there today (probably four weeks later - sortof forgot about the bench by this time) looking for mirrors/frames and there's my bench all refinished, they never called. So I asked if I can buy (for the third time)it right now. And here it is. But it looks like the mirrors are going to be another process. I never been to an antique store that doesn't want to sell you stuff. And now it's going in the basement....for while.

WEDNESDAY

New wall tile in the upstairs bathroom. Myles wanted to do a darker grout once he saw it on the wall without grout (changes the look as I already mentioned) but Mark had already used white grout in the shower. I think using two different grouts on the same tile in the same room would be weird. Sorry Mylo..




The stucco patching began today. He's patching the old electrical meter location in the picture. The new stairs are also ready for concrete which will happen tomorrow if it doesn't rain.



This is what our back deck looks like right now, I've completely given up cleaning. The stucco guy was just about to start repairing the old door location.



A close up of the stucco patching of the old back door. New building paper and welded wire mesh.



The new hardwood flooring in the upstairs bedroom.



The first exterior window trim for our approval, it failed. Just a couple of things. Firstly the flashing is too large (so he's ordering a smaller one that will look neater), the top trim peice is being enlarged to overhang the sides by 1" and finally he wasn't supposed to be installing trim. It was funny as our contractor phoned to tell me the first window had been done and if I wanted to take a look at for approval. So I ran over and phoned Myles to let him know what the window installer had done and in the process Myles inquired why they were even installing window trim....as we haven't had the house painted yet. The exterior painting quote was based on no trim (cheaper) so I had to phoned him and begged him to not increase his quote but still allow us to put the trim on as I hate sending trades home when they are there to work. And he didn't.



Sanding of the stairs.



Dirty bathtub....



Clean bathtub.....It's in good shape for being sixty four years old.


Tuesday, April 21, 2009

TILE IS COMPLICATED.....

I am currently in the process of cleaning off the existing cast iron tub in the main floor bathroom. Not a fun job. The existing plaster and lath is substantially thicker than the new water-proof gypsum board they have surrounded the tub with, so more of the tub is exposed. We could have added another layer of drywall to the walls, but again, timing is an issue now. So I am cleaning it off the best I can and the tile will cover some, but not all, of the marks. But it's an old tub that I chose to keep and can't expect it to be perfect.



The tile guy (guess I should refer to him as Mark instead of tile guy) finished the upstairs shower as well. It's very white. But looks amazing. I will probably refer to everything the tile guy (Mark) does as amazing, as it's just so nice to have finishes going on the wall at this point. My poor claw foot tub is just getting shifted around and around but it had to be there and it wouldn't fit through the existing door opening, so it had to go in while they were framing. We had alot of debate about tile today. We had shown on our drawings for the bathroom to have 6" MDF flat stock base trim and then have the tile (there is subway tile on the walls around the claw foot tub) butt into the top of the base trim. I guess this is an odd detail and usually the tile runs right down to the floor. I suppose the reasoning is it's tile is doesn't need a base. So back and forth, back and forth (had to call Angie @ Pop Design in Calgary who gave me some good advice, I always trust her!! : )) and now it's going right to the floor. Weird things that come up that I just don't know about.


FRONT STEPS

These are the existing front steps. Our initial thought with the front steps was to rip them out and build a new wood porch with a new railing. This was really important at the time. The existing screen door opened out and every time Myles and I arrived at the house it was a pain to get in, as two people couldn't stand on the porch at the same time. Now that we have the new door, which opens in, we don't seem to have the quite the same need for a bigger porch. But it was in the budget. The other problem was that the existing porch is solid concrete, it's not hollow like the newer precast steps, so they would have to get the little bobcat machine back in to hack it out, which would be quite a procedure. So between our contractor and ourselves, we have come up with an alternative.





We are pouring a new concrete porch right over the existing concrete porch. I know, I know, it's still concrete but budget and time constraints are just too much at this point. If I truly had my way I would have wanted it to be brick but that wasn't going to happen. Anyways this will look very nice. It is substantially larger, will have a very nice white railing on it to match the exterior trim and it is going to be an exposed aggregate finish, which will look quite nice.



This is the exposed aggregate on the new sidewalk patch they had to do for the water line. So this is what they are matching too...

FLOORING (AMAZING...)

Main floor bathroom tile was laid today. Very intense little tile but it's such a small space it looks really neat. It will look especially neat with the wall hung sink with chrome legs.




Upstairs bathroom flooring with grout. Grout always worries me, it's so hard to pick a color and it can really change the look of the tile. This one is basically the color of the tile, looks good. Very simple. Someone else has already inquired about this tile so....it's from Home Depot (approx. $3.50/sf). I honestly looked at more expensive tile but couldn't find one that I like enough. This is a very grey brown color with not alot of variation which is hard to find, or it's super expensive. And $3.50/sf in tile is cheap. It is not full-body porcelain so if it chips it will show white, but for most residential applications it should be just fine.



The flooring on the main floor is almost done. They have patched all the holes and are in the process of just finishing up the edges in the living room. I can honestly say for all the problems we have had with these guys the floor does look great. When Myles and I first bought this home and discuss taking out that main wall between the narrow hallway and living room we knew that we would have to patch the main floor. We even discussed just patching it perpendicular to the run of the existing hardwood, "just put in a few pieces it will be fine, the floor is old..." Well, you almost can't even tell we took out a wall. We have decided not to stain it, we could right at this moment, but choose to leave it the natural fir and have it age as it aged befored. So it doesn't quite match the existing trim and doors (they are alot darker) but the general color is there. Tomorrow they will start laying the wood upstairs and sanding the stair themselves.


Friday, April 17, 2009

THE GOOD, THE BAD & THE REALLY BAD....

THE GOOD
So best to start with the good. This first picture is the scratch coat that goes between the heated floor and the tile. Tile guy (who is awesome)laid this yesterday and then today he laid the floor.



It looks amazing...very happy with it.



THE BAD

So yesterday the flooring guys were almost fired. They were supposed to start Monday but phoned our contractor on Wed. night saying that they could start tomorrow AM, so Impact was there early AM to move the appliances (which they said they couldn't work around) outside on the deck. Good thing is was a beauty day. I heard from Impact around 11:30am flooring guy was pissed off as there is something really hard on our floors that is making it take an extra long time to sand....and that he was taking a break. So I show up at noon, tile guy is there but then leaves so there are our brand new appliances just sitting outside with no one around. So I decided to wait for the flooring guy to come back. And I waited and then someone showed up in a Valley Flooring truck (we don't think he knew that I was an owner, I was working throwing out the old hardwood, an Impact job but I was just helping out) He started swearing, phoned the other flooring guy asking; "where are you", "I'm bleeping three hours behind schedule and don't have time for this bleeping bleep", "what are you bleeping doing at Whisky Jacks", "your not bleeping coming back, bleep, bleep!". The whole time I'm standing right there. Then he starts unloading hardwood into the house, slamming stuff around. Well, let's just say I phoned my contractor immediately asking to have them fired. Chad said he would call the owner immediately. And as soon as I walked into the back yard the guys phone started ringing, that was the owner!!! So he dumped (with alot of slamming and swearing) off a bunch of stuff did alittle work and then asked; "are you going to be here for awhile?" I answered "why" and he mumbled something, got a phoned call (Chad), talk to him for a bit (couldn't hear converstaion), got in his car and left. So there I am sitting around with our appliances on the back deck and no flooring getting done. Anyways, my way of thinking is that someone who's pissed off, mad, biligerant isn't going to do a good job and these are our old original floors that is costing us a fortune to refinish. The only way a company can learn they can't treat jobs like this is to get fired. But if I fired them we lose our timeline, which is super tight. So I was mad, mad, mad!!! So after talking to our contractor we are keeping them as supposedly they will do a fantastic job....we'll see, I have no faith. But on a good note what he has sanded looks awesome. Although nowhere near finished. But the flooring saga continues...




THE REALLY BAD....

So here he is, the cause of my stress!! Working away, well at least he's not at the bar!!! Although he smells like a bewery. Myles went and visited him at lunch, helped him move the appliances around again (inside this time, when he informed Myles that he was just looking at our cabinets and one of the door just fell off. Sure........
So talked to Chad (again) and he's going to talk to the owner (again!) as we need a whole new cabinet box (which is basically the whole island) to be redone as he ripped the hinges right out of the mdf and you can't re-attach. When I showed up to meet with Chad to discuss the cabinet door just magically falling off, the flooring guy tried joking with me, "Chad and I have discussed it and you not going to be able to keep your floors...ha, ha, just kidding" I almost lost it! So I can't even speak to him now.

You are a bad, bad man...Mr flooring guy.....



Fell off...... my ass!!!