Wednesday, May 6, 2009

DOWN TO THE WIRE

Unforunately I have no time to write a blog just enough to get some pictures up. Moving in this weekend if you can believe it.

Hey all, so it's been total havoc for the past week!! Cath has been slaving at the house every day stripping and painting doors, priming walls and being an overall warrior! I've been coming after work and we've been painting like crazy people, but it sort of sucks because we don't have lights yet (hopefully today) so we can only work until about 8:00 when it gets dark.

Here's some pix of where we're at now.. The kitchen people were in yesterday and today to fix all the f#&k ups. There's a few more things he needs to do, but he needs to get pieces made so it'll probably be another week or so before the kitchen is complete.
Our appliances are being put in today and hooked up. The main floor bathroom is painted and the toilet and sink are installed. Just need to attach the legs and towel bars and get the shower curtain rod up and we're good to go. The tile will be finished in there today too. Light fixtures are getting installed and hopefully they'll be energized today so we have some light.

The finish carpenter is doing an amazing job!! We're super happy with all the little details he's incorporating as you can see from the picture of the baseboard detail.

The railing is on the deck and looks really good. They've also built a fancy box with a little door on it to hide the gas meter and it turned out surprisingly well, considering 2 weeks ago the framer had no freakin' idea what he was going to do there. Our backyard is a bloody disaster, but it's getting cleaned today, well, it HAS to be cleaned up today because the container with all our stuff in it is getting dropped off in the back yard Thursday morning. Then we have to move all our stuff out of the condo, get it all cleaned up, move all our stuff into the house......

We'll get you some more detail on stuff soon I hope, just way too busy right now!

Cheers,
Mylo













Wednesday, April 29, 2009

INTERIOR CONSTRUCTION CONTINUES.......

New countertops. Yahhhh! I really like them, very solid black color, supposedly it looks like Corian (I don't really like Corian so that was upsetting but.....whatever). Might look like Corian but it will act like Granite. The new sink is in and we have to do some custom trim around the sink. These new farmhouse style sinks that are popular right now are difficult for the kitchen installer, ours was close but still needs some custom work around it. As for the kitchen we've only paid 50% and were not going to pay anymore until it's absolutely complete. It was a shitty installation. Everything can be fixed but it's just a pain in the butt. We like it but it's still just a pain in the butt. Note: kitchen is still painted the wrong color so ignore that. Still looks purple/blue color.



New insulation was blown in yesterday. They also came and cleaned the attic space up, took away all the old insulation batts and blew in new insulation. It's very fluffy!! I had to go digging through it all because the flooring guys put one of my HVAC covers (one of the original ones that goes with the house) in the attic while they were doing the floors. So the insulation guys just covered it up. So there was a bit of panic until we phoned them asking where it was and I had to go poking around in the attic space to get it. It's been a nightmare trying to keep all the original fixtures that we are re-using safe. I keep finding them all over the house. Frustrating.




More pictures of the new floors. They still get one more buff and seal but it's one of the last things that happens.





So we still have no power, no gas, no toilet, no operable fixtures of any kind and we were supposed to move in in 2 days..........yeah. Right.

The kitchen cabinets were installed so shittily, that the counter top guy had to spend an hour shimming the tops of the cabinets so the countertop would be level. So the kitchen jackasses still have to come in and fix all their f%#k ups.

But it'll all be done next week..........yeah. Right.

We can't move in until we have the final inspections from the City of Kelowna, so that means all the handrails for stairs, all the gas-fitting and plumbing fixtures need to be installed because we ARE moving in next weekend.

But it will all be done next week.........yeah. Right.

My .02 - Mylo

PS. I totally love renovating. ;) but hey, I'm going golfing tomorrow.....so is it really that bad? I think not.

Lata

EXTERIOR CONSTRUCTION CONTINUES....

New front conc. porch right after concrete pour.



Finish exposed aggregate conc. front porch. Still has to come and acid wash it and seal it, which will darken it up.



Front of house still missing railing, trim for windows & doors & paint. But otherwise complete.



Back of the house with the stucco patched, did a very nice job. You can barely tell and especially after we paint it. Stairs/railing are being completed today.



So we are taking occupancy in one week......what a mess!

Monday, April 27, 2009

PUPPIES..SOONER RATHER THAN LATER

This is Gibson...



And this is Gibson..I think...



This isn't Gibson...I think....



These definitely aren't Gibson but they are super cute.




Sorry I take horrible pictures when I'm with puppies, easily distracted.
So our puppy is coming sooner rather than later and for Mylo and I that's not so good. The whole puppy story is quite complex so I hope I get it right. The puppies dad, Luca, is fully papered while the mom, Tori, doesn't have her papers yet. It was an accidental meet and greet that occurred, she didn't want to breed them for another year or so or until Tori was registered. Because she isn't registered the owners of the parent dogs have some very strict legal requirements that she, (Dana) has to follow. At first they wanted the pups aborted (horrible I know, sorry but this story gets worse) but they managed to negotiate some legal requirements so that the pups could live. Every person who buys a pup has to sign a document (with a deposit) that they will be neutered by Dana before released. It's alittle earlier than most people have it done (the absolute min. is 10 pounds). The breeders of the parents are making her have it done at exactly 10 pounds, so she doesn't want to put the pups back together afterwards as they are starting to play rough and will rip each other stitches out. So they have to go to their new homes immediately. So in our case thats Thursday!!!! So not ready. We are going to have to tell Dana to keep the pup at the least the weekend so we can move out of the condo and into the house. Chaos!
Now the sad part. Only three pups are spoken for (three people have backed out! for various reasons) The association in Kelowna that is responsible for rules and regulations on litters (can't remember what it's called) will only allow Dana to keep the pups on her premises for 90 days. The breeders of the parents are not allowing her to place them at the SPCA so they will be put down. So she has asked Mylo and I to foster a puppy (we won't get that one for awhile) so she has more time to find homes if it comes down to that. Ummmm how do you say no to that? She still might be able to get homes, still some time. So we will probably have two at some point and then there will be tears when one leaves. But I have talked to other people who have fostered and you usually glad to have to one go.

Friday, April 24, 2009

LOCKED OUT

Original View from Dining Room to Living (ahh remember that beautiful carpet..)



Next construction...this is actually the view from Living Room to Dining Room but it's still the same floor. What a mess!



Floor being sanded.



Floor after oil wood finish. Couldn't do the acrylic finish (smells way better than the oil) I guess due to the nature of the old floors at least that's what I was told. I didn't want to anyways as the oil finish darkens the wood slightly and the color will age better than with an acrylic finish. Anyways we won't be able to finish these floors again, this is it. We will just have to take care of them, and just put new finish on, there isn't enough to sand them down again.



Floors with the first coat of sealer on it. I think it's still wet, looks so glossy. The house is now empty for two days. And boy does it smell.....but we are not going to be moving in for awhile. May 10th is the move in day (ish). So now that we can't get in the house or do anything on the house this weekend the next blog will be puppies....we get to see them tomorrow. And we get our puppy on May 10th....wow!



Wednesday, April 22, 2009

ANTIQUES

This our first purchase and it was quite a procedure. I bought it from a antique store called Lois Lane (wasn't expensive or anything, just liked it because it was small and thought it would fit in the space). A few people who read this blog will understand this but Lois Lane is the hardest antique store to buy anything from. I picked out the bench (which was alittle beat up) and asked to buy it. Big debate about finishing it etc., she didn't want to let it go without seeing what it would look like refinished but she needed to talk to her son. So I said I would be back. When I came back it wasn't finished, offered to take it as is again, but again he (the son this time) wanted to finish it. so we again agreed on a price and that they would call when done. It's just a little wooden bench so I wasn't too picky on what he wanted to do to it. So went there today (probably four weeks later - sortof forgot about the bench by this time) looking for mirrors/frames and there's my bench all refinished, they never called. So I asked if I can buy (for the third time)it right now. And here it is. But it looks like the mirrors are going to be another process. I never been to an antique store that doesn't want to sell you stuff. And now it's going in the basement....for while.

WEDNESDAY

New wall tile in the upstairs bathroom. Myles wanted to do a darker grout once he saw it on the wall without grout (changes the look as I already mentioned) but Mark had already used white grout in the shower. I think using two different grouts on the same tile in the same room would be weird. Sorry Mylo..




The stucco patching began today. He's patching the old electrical meter location in the picture. The new stairs are also ready for concrete which will happen tomorrow if it doesn't rain.



This is what our back deck looks like right now, I've completely given up cleaning. The stucco guy was just about to start repairing the old door location.



A close up of the stucco patching of the old back door. New building paper and welded wire mesh.



The new hardwood flooring in the upstairs bedroom.



The first exterior window trim for our approval, it failed. Just a couple of things. Firstly the flashing is too large (so he's ordering a smaller one that will look neater), the top trim peice is being enlarged to overhang the sides by 1" and finally he wasn't supposed to be installing trim. It was funny as our contractor phoned to tell me the first window had been done and if I wanted to take a look at for approval. So I ran over and phoned Myles to let him know what the window installer had done and in the process Myles inquired why they were even installing window trim....as we haven't had the house painted yet. The exterior painting quote was based on no trim (cheaper) so I had to phoned him and begged him to not increase his quote but still allow us to put the trim on as I hate sending trades home when they are there to work. And he didn't.



Sanding of the stairs.



Dirty bathtub....



Clean bathtub.....It's in good shape for being sixty four years old.