Wednesday, January 28, 2009

MORE PHOTOS....


Unfortunately we can't keep the fir floor in the bathroom there is just too much moisture damage. But that's OK as I had already picked out a tile that would look really cool in a bathroom and I couldn't put it upstairs as it requires a little space. The fir in the kitchen is good though, so we were happy about that. It's just still covered with cardboard from the bottom layer of linoleum (there were two layers, one had asbestos and one didn't).








Mom, I think you mentioned that there weren't any good photos of the kitchen area so I've tried to take a few more. It's nice to have some good 'before' shots as it's not going to look anything like it looks right now.

I took some of these before the asbestos was removed in the kitchen and some after. It's an interesting procedure to remove the asbestos: Two men come in seal the entire area off with duct tape and plasti. Then they suck all the air out of the area with a vacu-hose to create a negative pressure in the space, then rip up the floor and package it into sealed bags and then inject the air with some sort of particulate that hits the airbourne asbestos molecules and cause it to fall to the floor, then they vacuum everything up and it's good to go. I guess the problem with asbestos is the amount of time it remains in the air, that's why it is so nasty. We have some more on the basement ductwork which will be removed when we start to make the changes to the ductwork.

THE PLANS

We have finally finished our design and drawings. We sent drawing sets out to three contractors today and the drawings will be submitted to the City of Kelowna for Building Permit tomorrow. So now Mylo and I cross our fingers that we can afford to do what we designed. Chances are we will have to do some redesign due to budget constraints but hopefully not to much.


Existing Main Floor Plan
As you can see the two main problem with the house was the extremely narrow hallway between the Entry and the Kitchen as well as the actual size of the kitchen.

Existing Upper Level Plan
Nothing much had been done to the second level. Both rooms were very small and it did not have any sort of landing space at the top of the stairs.

New Site Plan
Here is the the new site plan. We are keeping the existing garage/shed on the upper right and adding a new, small 2 car garage on the upper left w/ my jam room. We've also added a new deck off the house which will get a lot of use during the warm summer evenings.
New Main Floor Plan
We have removed the main wall between the Living Room and Entry/Hallway and opened up the stairwell as much as structurally possible. We basically removed the hallway completely using the end of the hallway for the new fridge. The existing back door has been removed and new terrace doors (the same as what we had in Calgary) were added off of the Dining Room. The wall between the Dining Room and Kitchen has been moved and modified to allow for more kitchen area. A brick chimney flue that runs from the basement to the roof has been exposed on both the main and upper levels.

New Upper Floor Plan
We have added a new master ensuite and created a master loft bedroom w/a new walk in closet and closet in the attic space.

So, that's what we're planning. Hopefully it's all in the budget! We're also planning all new windows and doors, new hot water tank, new lighting, refinishing the existing fir flooring and adding new fir hardwood in the bedroom upstairs, new tile in both bathrooms and an air-source heat pump which will provide the majority of the heating for the house until the temperature drops to below -5C and then the furnace will take over and as well will provide cooling so we don't sweat to death in mid-summer! We will be having an energy efficiency audit done on the house in the next week or so and then again when we are finished the reno. Between the Province of BC and the Federal Government, we can get some cash back for installing energy efficient appliances, thermally broken windows and other items which are too numerous to list. BC has many more incentives to be 'green' than Alberta does, so that is working in our benefit.

That is all for now, we'll update again once we get our costing back and let you know when we're starting. Then it will really get exciting as we can show you photos of the demolition and the process of re-creating our new home at 800 Sutherland Avenue.

Cheers,

Cath and Mylo
Enjoy

Thursday, January 22, 2009

Getting Closer

Yo. So we're getting closer to starting this damn thing. Cath has been a busy little bee getting the drawings up to stuff and we're super close now. We're planning to give drawings to the contractors early next week so they can give us a price!! Now we hold our breath and hope we haven't gone too far.

As Cath mentioned in an earlier post, our hand has been forced and we have to build the garage sooner rather than later in order to accommodate the upgraded 200A electrical service to the house. This is not a bad thing. With the garage being built concurrent with the interior reno, I get a place to play my guitars as loud as I want much sooner!! So I'm excited about that!

I've been on the phone with the utilities getting locates done on our incoming services. We'll need to move the gas meter and up-size the meter and regulator to achieve a higher delivery pressure in order to feed the new appliances. The meter will be anchored off the new deck, not the house, which is helpful to us because in it's current location, it doesn't meet code due to the proximity of doors and windows to the regulator. Luckily the incoming gas service runs right between the existing shed and new garage and the secondary from the main will not have to be up-sized. So that will save us some cash. We'll probably need to up-size the piping inside the house, but we'll find out for sure from the gas-fitter.

An all new 200A electrical service will be fed to a panel in the garage with a secondary feeder running to a new panel in the house. We need to up-size in order to accomodate the increased load that the future hot tub and central air conditioner will impose on the system. These are the joys of buying an un-modified 63 year old house. But it's going to be pretty sicky when it's done I think. Cath has done an absolutely amazing job of re-designing the spaces. My input has been pretty minimal, but I need to keep her in line from time to time as she get's some really fancy (read: expensive) ideas sometimes : )

That's all for now. Long winded I know, but now you're up to speed. Once the drawings are done, we'll be posting them on here so everyone can see what the plan is.

P.S. Thanks to everyone for the good wishes and phone calls and such over the holidays while I was in the hospital with an exploded pancreas. I appreciate it. All is good now, feeling good and ready to get on this reno and back in the gym and get ready for an Okanagan spring!!

Mylo

Wednesday, January 7, 2009

HEALTH HICCUP

So hasn't been much news on the renovation front over Christmas. As most of you probably already heard Mylo was admitted to the hospital early AM on Dec. 30th with a pancreatitis attack. The pancreas basically gets really upset and starts oozing jelly like substance into your adominal cavity, enzymes into your stomach and it's really, really painful. I was just reading back on Jenny's blog when she was describing her "surreal" experience in the hospital that is sort of how I feel about poor Mylo's stay. Was definintely the worst hospital experiences I've ever seen (even worst than my own). After nine hours in emergency he was finally admitted, spent a day in a hallway, and then finally got a room, which you would think would be a good thing. It wasn't. Let's just say the other patients in the room were disruptive to say the least. Anyways he's back on home recovering and everything is fine, just a small lifestyle change that's all.

We have finally meet with some contractors. That's always tough, hard to pick. One guy is really big in Kelowna, which I don't know if that's so good for us as we are rather small. But he definintely knew his stuff just that he's probably more expensive. The other fella was very nice, much more willing to work with our own trades or products. Decisions, decisions.

I'm going today to drop off some linoleum for asbestos testing. Let's hoping it's not, not that big of a deal to remove it just more money, which I would rather spend on something else.

And as all renovations do we have already run into our first problem....electrical.
The main service is coming into the house from the lightpost on the main street. There is only one other house on the street that has this issue as well. All the others have been upgaded. Everyone seems to be running off the lines in the alley to either their garages or carriage houses and then into the house. Can't run it directly to the house as Fortis will not allow electrical lines to encroach over roof lines and the future holds a garage. We hadn't planned to do the garage right away but we might have to. Just doesn't make sense not to. Then that lead to other issues, the old garage that is there, which I wanted to keep, might have to be demolished as the bylaw stipulates only one out building per site. So the problems have begun but there is always solutions.

Sunday, December 28, 2008

HOUSE WARMING PRESENT


This is a painting of the 'boys cabin' at Shuswap that my Aunt Francie and cousin Lia gave Mylo and I as a house warming present. We love it! Thank you very much.
It is by an artist from Salmon Arm who has been doing some paintings of the cabins on Shuswap Lake.

FUNNY PICTURE


When we were trying to decide whether we should buy this house I did alittle photoshop work to try convince Mylo that a little work and it would look 100x's better. This is what I came up with, remember that it was quick and just for fun.

FIRST DAY OF WORK

This is the back of the house, I forgotten to add this existing photo. Have to imagine a deck, some trees, some trellis's. Well anything would make it look better.


This is the garbage from the first day. Guess we should call on the garbage pick up in Kelowna, timing and quantity etc. Seems to be different than Calgary.
I have also added existing photos of the garage and back of the house which I forgotten to take.





We did our first day of work yesterday and both are feeling it today. Very sore. Ripped up all the green carpet, underlay and paper, all the tacking and all the staples....all the staples in the dining room, living room, hallway, entrance way, and bedroom.
It was alot of work but looks so much better. The floors seem to be finished in some areas and not finished in others so we are going to have them sanded and finished. I don't think we will stain them although the discussion has come up as Mylo and I both like dark floors but that would bump up the price. And the floors have a very rustic charm that I think is partly the color.