Wednesday, January 28, 2009

THE PLANS

We have finally finished our design and drawings. We sent drawing sets out to three contractors today and the drawings will be submitted to the City of Kelowna for Building Permit tomorrow. So now Mylo and I cross our fingers that we can afford to do what we designed. Chances are we will have to do some redesign due to budget constraints but hopefully not to much.


Existing Main Floor Plan
As you can see the two main problem with the house was the extremely narrow hallway between the Entry and the Kitchen as well as the actual size of the kitchen.

Existing Upper Level Plan
Nothing much had been done to the second level. Both rooms were very small and it did not have any sort of landing space at the top of the stairs.

New Site Plan
Here is the the new site plan. We are keeping the existing garage/shed on the upper right and adding a new, small 2 car garage on the upper left w/ my jam room. We've also added a new deck off the house which will get a lot of use during the warm summer evenings.
New Main Floor Plan
We have removed the main wall between the Living Room and Entry/Hallway and opened up the stairwell as much as structurally possible. We basically removed the hallway completely using the end of the hallway for the new fridge. The existing back door has been removed and new terrace doors (the same as what we had in Calgary) were added off of the Dining Room. The wall between the Dining Room and Kitchen has been moved and modified to allow for more kitchen area. A brick chimney flue that runs from the basement to the roof has been exposed on both the main and upper levels.

New Upper Floor Plan
We have added a new master ensuite and created a master loft bedroom w/a new walk in closet and closet in the attic space.

So, that's what we're planning. Hopefully it's all in the budget! We're also planning all new windows and doors, new hot water tank, new lighting, refinishing the existing fir flooring and adding new fir hardwood in the bedroom upstairs, new tile in both bathrooms and an air-source heat pump which will provide the majority of the heating for the house until the temperature drops to below -5C and then the furnace will take over and as well will provide cooling so we don't sweat to death in mid-summer! We will be having an energy efficiency audit done on the house in the next week or so and then again when we are finished the reno. Between the Province of BC and the Federal Government, we can get some cash back for installing energy efficient appliances, thermally broken windows and other items which are too numerous to list. BC has many more incentives to be 'green' than Alberta does, so that is working in our benefit.

That is all for now, we'll update again once we get our costing back and let you know when we're starting. Then it will really get exciting as we can show you photos of the demolition and the process of re-creating our new home at 800 Sutherland Avenue.

Cheers,

Cath and Mylo
Enjoy