Friday, April 24, 2009

LOCKED OUT

Original View from Dining Room to Living (ahh remember that beautiful carpet..)



Next construction...this is actually the view from Living Room to Dining Room but it's still the same floor. What a mess!



Floor being sanded.



Floor after oil wood finish. Couldn't do the acrylic finish (smells way better than the oil) I guess due to the nature of the old floors at least that's what I was told. I didn't want to anyways as the oil finish darkens the wood slightly and the color will age better than with an acrylic finish. Anyways we won't be able to finish these floors again, this is it. We will just have to take care of them, and just put new finish on, there isn't enough to sand them down again.



Floors with the first coat of sealer on it. I think it's still wet, looks so glossy. The house is now empty for two days. And boy does it smell.....but we are not going to be moving in for awhile. May 10th is the move in day (ish). So now that we can't get in the house or do anything on the house this weekend the next blog will be puppies....we get to see them tomorrow. And we get our puppy on May 10th....wow!



Wednesday, April 22, 2009

ANTIQUES

This our first purchase and it was quite a procedure. I bought it from a antique store called Lois Lane (wasn't expensive or anything, just liked it because it was small and thought it would fit in the space). A few people who read this blog will understand this but Lois Lane is the hardest antique store to buy anything from. I picked out the bench (which was alittle beat up) and asked to buy it. Big debate about finishing it etc., she didn't want to let it go without seeing what it would look like refinished but she needed to talk to her son. So I said I would be back. When I came back it wasn't finished, offered to take it as is again, but again he (the son this time) wanted to finish it. so we again agreed on a price and that they would call when done. It's just a little wooden bench so I wasn't too picky on what he wanted to do to it. So went there today (probably four weeks later - sortof forgot about the bench by this time) looking for mirrors/frames and there's my bench all refinished, they never called. So I asked if I can buy (for the third time)it right now. And here it is. But it looks like the mirrors are going to be another process. I never been to an antique store that doesn't want to sell you stuff. And now it's going in the basement....for while.

WEDNESDAY

New wall tile in the upstairs bathroom. Myles wanted to do a darker grout once he saw it on the wall without grout (changes the look as I already mentioned) but Mark had already used white grout in the shower. I think using two different grouts on the same tile in the same room would be weird. Sorry Mylo..




The stucco patching began today. He's patching the old electrical meter location in the picture. The new stairs are also ready for concrete which will happen tomorrow if it doesn't rain.



This is what our back deck looks like right now, I've completely given up cleaning. The stucco guy was just about to start repairing the old door location.



A close up of the stucco patching of the old back door. New building paper and welded wire mesh.



The new hardwood flooring in the upstairs bedroom.



The first exterior window trim for our approval, it failed. Just a couple of things. Firstly the flashing is too large (so he's ordering a smaller one that will look neater), the top trim peice is being enlarged to overhang the sides by 1" and finally he wasn't supposed to be installing trim. It was funny as our contractor phoned to tell me the first window had been done and if I wanted to take a look at for approval. So I ran over and phoned Myles to let him know what the window installer had done and in the process Myles inquired why they were even installing window trim....as we haven't had the house painted yet. The exterior painting quote was based on no trim (cheaper) so I had to phoned him and begged him to not increase his quote but still allow us to put the trim on as I hate sending trades home when they are there to work. And he didn't.



Sanding of the stairs.



Dirty bathtub....



Clean bathtub.....It's in good shape for being sixty four years old.


Tuesday, April 21, 2009

TILE IS COMPLICATED.....

I am currently in the process of cleaning off the existing cast iron tub in the main floor bathroom. Not a fun job. The existing plaster and lath is substantially thicker than the new water-proof gypsum board they have surrounded the tub with, so more of the tub is exposed. We could have added another layer of drywall to the walls, but again, timing is an issue now. So I am cleaning it off the best I can and the tile will cover some, but not all, of the marks. But it's an old tub that I chose to keep and can't expect it to be perfect.



The tile guy (guess I should refer to him as Mark instead of tile guy) finished the upstairs shower as well. It's very white. But looks amazing. I will probably refer to everything the tile guy (Mark) does as amazing, as it's just so nice to have finishes going on the wall at this point. My poor claw foot tub is just getting shifted around and around but it had to be there and it wouldn't fit through the existing door opening, so it had to go in while they were framing. We had alot of debate about tile today. We had shown on our drawings for the bathroom to have 6" MDF flat stock base trim and then have the tile (there is subway tile on the walls around the claw foot tub) butt into the top of the base trim. I guess this is an odd detail and usually the tile runs right down to the floor. I suppose the reasoning is it's tile is doesn't need a base. So back and forth, back and forth (had to call Angie @ Pop Design in Calgary who gave me some good advice, I always trust her!! : )) and now it's going right to the floor. Weird things that come up that I just don't know about.


FRONT STEPS

These are the existing front steps. Our initial thought with the front steps was to rip them out and build a new wood porch with a new railing. This was really important at the time. The existing screen door opened out and every time Myles and I arrived at the house it was a pain to get in, as two people couldn't stand on the porch at the same time. Now that we have the new door, which opens in, we don't seem to have the quite the same need for a bigger porch. But it was in the budget. The other problem was that the existing porch is solid concrete, it's not hollow like the newer precast steps, so they would have to get the little bobcat machine back in to hack it out, which would be quite a procedure. So between our contractor and ourselves, we have come up with an alternative.





We are pouring a new concrete porch right over the existing concrete porch. I know, I know, it's still concrete but budget and time constraints are just too much at this point. If I truly had my way I would have wanted it to be brick but that wasn't going to happen. Anyways this will look very nice. It is substantially larger, will have a very nice white railing on it to match the exterior trim and it is going to be an exposed aggregate finish, which will look quite nice.



This is the exposed aggregate on the new sidewalk patch they had to do for the water line. So this is what they are matching too...

FLOORING (AMAZING...)

Main floor bathroom tile was laid today. Very intense little tile but it's such a small space it looks really neat. It will look especially neat with the wall hung sink with chrome legs.




Upstairs bathroom flooring with grout. Grout always worries me, it's so hard to pick a color and it can really change the look of the tile. This one is basically the color of the tile, looks good. Very simple. Someone else has already inquired about this tile so....it's from Home Depot (approx. $3.50/sf). I honestly looked at more expensive tile but couldn't find one that I like enough. This is a very grey brown color with not alot of variation which is hard to find, or it's super expensive. And $3.50/sf in tile is cheap. It is not full-body porcelain so if it chips it will show white, but for most residential applications it should be just fine.



The flooring on the main floor is almost done. They have patched all the holes and are in the process of just finishing up the edges in the living room. I can honestly say for all the problems we have had with these guys the floor does look great. When Myles and I first bought this home and discuss taking out that main wall between the narrow hallway and living room we knew that we would have to patch the main floor. We even discussed just patching it perpendicular to the run of the existing hardwood, "just put in a few pieces it will be fine, the floor is old..." Well, you almost can't even tell we took out a wall. We have decided not to stain it, we could right at this moment, but choose to leave it the natural fir and have it age as it aged befored. So it doesn't quite match the existing trim and doors (they are alot darker) but the general color is there. Tomorrow they will start laying the wood upstairs and sanding the stair themselves.


Friday, April 17, 2009

THE GOOD, THE BAD & THE REALLY BAD....

THE GOOD
So best to start with the good. This first picture is the scratch coat that goes between the heated floor and the tile. Tile guy (who is awesome)laid this yesterday and then today he laid the floor.



It looks amazing...very happy with it.



THE BAD

So yesterday the flooring guys were almost fired. They were supposed to start Monday but phoned our contractor on Wed. night saying that they could start tomorrow AM, so Impact was there early AM to move the appliances (which they said they couldn't work around) outside on the deck. Good thing is was a beauty day. I heard from Impact around 11:30am flooring guy was pissed off as there is something really hard on our floors that is making it take an extra long time to sand....and that he was taking a break. So I show up at noon, tile guy is there but then leaves so there are our brand new appliances just sitting outside with no one around. So I decided to wait for the flooring guy to come back. And I waited and then someone showed up in a Valley Flooring truck (we don't think he knew that I was an owner, I was working throwing out the old hardwood, an Impact job but I was just helping out) He started swearing, phoned the other flooring guy asking; "where are you", "I'm bleeping three hours behind schedule and don't have time for this bleeping bleep", "what are you bleeping doing at Whisky Jacks", "your not bleeping coming back, bleep, bleep!". The whole time I'm standing right there. Then he starts unloading hardwood into the house, slamming stuff around. Well, let's just say I phoned my contractor immediately asking to have them fired. Chad said he would call the owner immediately. And as soon as I walked into the back yard the guys phone started ringing, that was the owner!!! So he dumped (with alot of slamming and swearing) off a bunch of stuff did alittle work and then asked; "are you going to be here for awhile?" I answered "why" and he mumbled something, got a phoned call (Chad), talk to him for a bit (couldn't hear converstaion), got in his car and left. So there I am sitting around with our appliances on the back deck and no flooring getting done. Anyways, my way of thinking is that someone who's pissed off, mad, biligerant isn't going to do a good job and these are our old original floors that is costing us a fortune to refinish. The only way a company can learn they can't treat jobs like this is to get fired. But if I fired them we lose our timeline, which is super tight. So I was mad, mad, mad!!! So after talking to our contractor we are keeping them as supposedly they will do a fantastic job....we'll see, I have no faith. But on a good note what he has sanded looks awesome. Although nowhere near finished. But the flooring saga continues...




THE REALLY BAD....

So here he is, the cause of my stress!! Working away, well at least he's not at the bar!!! Although he smells like a bewery. Myles went and visited him at lunch, helped him move the appliances around again (inside this time, when he informed Myles that he was just looking at our cabinets and one of the door just fell off. Sure........
So talked to Chad (again) and he's going to talk to the owner (again!) as we need a whole new cabinet box (which is basically the whole island) to be redone as he ripped the hinges right out of the mdf and you can't re-attach. When I showed up to meet with Chad to discuss the cabinet door just magically falling off, the flooring guy tried joking with me, "Chad and I have discussed it and you not going to be able to keep your floors...ha, ha, just kidding" I almost lost it! So I can't even speak to him now.

You are a bad, bad man...Mr flooring guy.....



Fell off...... my ass!!!