The drywall has been put in upstairs. Drywall is very interesting; one day you can't really figure out what it's going to look like and then the next day you can see exactly what it's going to look like. So it's always a shock the first time you walk in after it's been installed. I've taken some pictures of the upstairs but the space is small therefore it's getting harder and harder to take pictures that make any sense. But thought I would upload them anyway.
This is the loft bedroom. Behind the red brick column there is a little walk in closet (it's very small, we had to shrink it so we could get what we wanted in the bathroom) but it's still a walk-in.....sort of!!
The door that is leaning on the wall was going to be reused (we're painting it white) but the painter seems to think that I won't be able to paint it, or it's not worth the effort of stripping it. He had me convinced but I've since changed my mind (sorry Mylo). I think that I can strip it down and paint it. As well as the jamb, it's going to be some work but they are lovely doors. The reason it is white is we don't have enough original baseboard to do the upstairs so it is getting new white baseboards (6" high) so the door needs to be white as well.

View of the bathroom looking towards where the vanity will be. The build out on the right is framing required for the stair headroom clearance, we just took it all the way up to the ceiling with shelving. The plywood table on the left is covering the clawfoot tub.

This view is looking at the shower (to the left) and the toilet (straight ahead. There is an attic hatch door in the corner (right side) that we could not remove but I think I'll put some sort of peice of furniture in front of it. We are keeping the doors (there is another one in the bedroom) just adding weatherstripping and new hardware.

This view looks directly into the shower. The shelving above the stairwell is on the left and the right is the toilet location. We added some niches into the wall and they have caused all sorts of problems. They still are not correctly drywalled at this point even though the drywallers have left and the house is being mudded and taped right now. But they will. Why they didn't just do it????? Alot of whining on site and excuses on site right now but it's just hurts them in the long run as they just have to come back on there own time. (Sub-contractors are a total pain in my ass, just quit your bitching and get it done!!- M.)

The deck is almost complete, still needs the stairs and a box around the gas meter.

Close up of the new deck...

The flooring patch work started today. It's going to take him awhile but he's doing a really nice job of fixing & patching (using some existing wood, some salvaged wood and some new wood). He's a little upset, but it doesn't have to do with our floor, I guess he's mad at the drywall taper who dropped mud on his tool belt or something. But at least he's not complaining about our floor! It will be really beautiful natural Douglas Fir when it's finished!! Pretty stoked on the floor.

I've never done alot of drywall work in a renovation before. Little bits here and there so this was a bit of a shock. The mud/tape is everywhere, mudderss have got to be the messiest trade I've ever seen. What's on the wall looks great just that there is mud everywhere!!!! Like, everywhere!!! Talking to our contractor tomorrow about it. (It's a renovation..........it's messy!! Don't worry about it!! Yeah, not so much -M)

Does anyone know what this is, I have quite abit of it coming up. I know it's probably impossible to tell but thought someone might know.

And spring has arrived, here's a pretty picture of flowers in the front garden.