Wednesday, April 8, 2009

DRYWALL CONT....

The drywall has been put in upstairs. Drywall is very interesting; one day you can't really figure out what it's going to look like and then the next day you can see exactly what it's going to look like. So it's always a shock the first time you walk in after it's been installed. I've taken some pictures of the upstairs but the space is small therefore it's getting harder and harder to take pictures that make any sense. But thought I would upload them anyway.

This is the loft bedroom. Behind the red brick column there is a little walk in closet (it's very small, we had to shrink it so we could get what we wanted in the bathroom) but it's still a walk-in.....sort of!!
The door that is leaning on the wall was going to be reused (we're painting it white) but the painter seems to think that I won't be able to paint it, or it's not worth the effort of stripping it. He had me convinced but I've since changed my mind (sorry Mylo). I think that I can strip it down and paint it. As well as the jamb, it's going to be some work but they are lovely doors. The reason it is white is we don't have enough original baseboard to do the upstairs so it is getting new white baseboards (6" high) so the door needs to be white as well.



View of the bathroom looking towards where the vanity will be. The build out on the right is framing required for the stair headroom clearance, we just took it all the way up to the ceiling with shelving. The plywood table on the left is covering the clawfoot tub.



This view is looking at the shower (to the left) and the toilet (straight ahead. There is an attic hatch door in the corner (right side) that we could not remove but I think I'll put some sort of peice of furniture in front of it. We are keeping the doors (there is another one in the bedroom) just adding weatherstripping and new hardware.



This view looks directly into the shower. The shelving above the stairwell is on the left and the right is the toilet location. We added some niches into the wall and they have caused all sorts of problems. They still are not correctly drywalled at this point even though the drywallers have left and the house is being mudded and taped right now. But they will. Why they didn't just do it????? Alot of whining on site and excuses on site right now but it's just hurts them in the long run as they just have to come back on there own time. (Sub-contractors are a total pain in my ass, just quit your bitching and get it done!!- M.)



The deck is almost complete, still needs the stairs and a box around the gas meter.



Close up of the new deck...



The flooring patch work started today. It's going to take him awhile but he's doing a really nice job of fixing & patching (using some existing wood, some salvaged wood and some new wood). He's a little upset, but it doesn't have to do with our floor, I guess he's mad at the drywall taper who dropped mud on his tool belt or something. But at least he's not complaining about our floor! It will be really beautiful natural Douglas Fir when it's finished!! Pretty stoked on the floor.



I've never done alot of drywall work in a renovation before. Little bits here and there so this was a bit of a shock. The mud/tape is everywhere, mudderss have got to be the messiest trade I've ever seen. What's on the wall looks great just that there is mud everywhere!!!! Like, everywhere!!! Talking to our contractor tomorrow about it. (It's a renovation..........it's messy!! Don't worry about it!! Yeah, not so much -M)



Does anyone know what this is, I have quite abit of it coming up. I know it's probably impossible to tell but thought someone might know.



And spring has arrived, here's a pretty picture of flowers in the front garden.

Monday, April 6, 2009

PUPPIES!

Everyone this is Gibson...



Or....one of these is Gibson...........still hard to tell. There are four black males, one of them is Gibson!



This is the little girl S & P puppy that the owner is hoping Myles and I take as well. She really loves her and wants her to grow up in the area as well as with a brother. I think she likes us too!!! She is so cute and her name would be Stella. Shouldn't be naming dogs we don't own yet. Dana (the breeder) only has owners for five right now so four still need good homes.....hey Brad and Chris????



Dana has nicked named this one "Dr. Evil" already. Although he doesn't look it here he's already a mischevious little guy



So cute....seeing puppies sure helped calm my renovation stress!!

Sunday, April 5, 2009

DRYWALL, DECK & OTHER STUFF....

Things are moving along very quickly right now so having problems keeping up with pictures. The new stairs for the basement were installed on Thurs. Felt bad for all the trades having to go up and down the other stairs (with about 3'6" headroom clearance) and now we have new stairs (with about 6'-0" headroom) and they are done most of their work now! The are pretty steep but we are going to add a handrail so they should be fine, Myles doesn't even have to duck anymore.




The deck is almost complete in this picture. I can't keep up with the construction as the deck is now complete, I'm a couple of days behind. The cedar decking smells wonderful I wish the deck would smell like that forever but it won't. The deck is a great size, now that's it finish we can stand on it and figure out where to put things and figure out landscaping etc.





The main floor is almost completely drywalled now. We have had to add some drywall here and there (1/4") on existing walls as construction really did alot of damage. With all the drilling and hammering the house was shook up at bit which is not good for old plaster. So some walls were just too cracked. So they are just putting an sheet of 1/4" (usually they use 1/2") on top. Looks very different after drywall. You get so use to seeing it open and then suddenly it's closed off. They have started upstairs as well but haven't taken pictures yet.




One of the splurges for the house was a new tankless hot water heater, hot water on demand. Very excited to never run out of hot water. And will help out on our gas bills as we don't have to keep a tank full of water hot now. This installation cause a bit of a fiasco as I showed up one morning and there is a big vent on the front of the house. Again bascially an issue of trades not talking to each other and just installing stuff without any thought to asethetics or client opinion. So I freaked out...nicely. There is a basement slider window (openable) right by the location where the tankless hot water heater was going to be installed. The venting for the tank has to be a certain distance from an openable window. So when the installer was there he saw the basement window and went ahead and installed the vent out the front of the house. Unfortunately the builder and Myles and I had already discussed this window (as all four basement windows were ordered incorrectly) and that when they ordered new windows we were going to order than particular one as a fixed window (unopenable - is that a word?) We were prepared to pay for that window (would have been cheap) but since it was never communicated to the plumber we have told our builder to either move it (which I don't think will happen) and we will still cover the cost of the new window or he leaves, plants some landscaping around the vent outside and we don't cover the cost of that window. Confusing I know.



Other than that, drywall, taping and mudding happens all this week. Probably the new front porch as well. Next weekend we will be painting as much as we can before kitchen and plumbing fixtures are installed. Next Monday kitchen is installed and appliances arrive, next wednesday is granite templating and flooring begins. And Myles and I are in Vancouver for Tuesday/Wednesday, wow, that's bad timing. Oh well.

Tuesday, March 31, 2009

LOTS OF STUFF

The new Furnace arrived yesterday and was basically installed in a day. We ended up going with a Tempstar 95% High Efficiency Furnance. Energy rebate will be $1630.00. We thoroughly researched furnances to figure out which brand to install but came to the conclusion that reviews were good & bad for every single brand. Therefore we went with a better quality builders line that is made by Carrier.



This is the window causing so much grief right now. Gienow is arguing between themselves on were the fault lies (he said/she said). Unfortunately we don't really care where the error was made just that it has to be fixed. The basement windows were ordered incorrectly (either by a mistake on site measuring or ordering incorrectly), it is too big in the vertical direction. The fella on site had informed me that they were incorrect and that he had figured out a way to install them anyway. I very clearly told him that I wasn't very happy with the detail and that if it's a shoddy installation we would basically make him rip it out. And we are. He installed them without any framing above and below the window so directly onto the concrete...with PL400 (the glue of all glues) so he's going to have fun ripping them back out. As well, as you can see in the photo, because they had to rip out the existing bucks, there is no support whatsoever for 3 floor joists!! This needs to be fixed on the super-fast!! They have emergency ordered the one that is under the deck as the deck is being built this week. We will just see how this progresses.



Mylo unhappy about basement window....
But our new patio doors are in and they look very nice. You can also see, quite clearly, in this picture, the new gas meter that is just floating out in the middle of our yard. It is right at the end of the deck and will have a box framed around it to hide it from view on the house side. Terasen gas readers will not walk onto decks to read the meter so we had to put it at the end of the deck. I not sure I fully understand the rationale behind that but you can't argue so.



Shot of the back of the house with the new patio doors. The existing back door is still there, they are waiting to rip it out until we have our final framing inspection. We don't want any hold ups at this point so we are just leaving it there and hopefully he will just think it's part of our plans. This sort of thing happens if they feel there might be an issue with the inspector they just don't install it. Sneaky yes but the inspectors can cost you alot of money and headache. For example we are not installing the heat pump until after all inspections as they have a clause in new construction that all heat pumps have to be 6' away from the property line. We are installing ours on the side of the house and don't have 6' clearance. They could, technically, make us move it around to the back of the house and those things are big and ugly. You don't want to see it. So just to be safe we are installing it afterwards. I guess it's all a game.



New patio doors. It sure added alot of light.



They dug up our front yard yesterday, it looks alot worse then it is. Our main water line into the house was 1/2", we are upgrading to a 1" service to accomodate the new plumbing we are installing. I would have missed seeing all of this if the inspector had shown up when he was supposed to, but he should be there today and then all the dirt just goes back in and we have a strip of lawn with no grass. The lady who lived in the house before us had taken down a big tree on that side of the lot (wish she hadn't!) so during the excavation they found all the big tree roots and pulled them up. Some of them are neat looking so the contactor is going to move them into the back yard for me and I (read: Mylo) can put them in the garden (read: move them around 50 times until they're in just the 'right' spot!! - M). I was also going to take part of the sidewalk they had removed, a very nicely cut slab o'concrete. (for a bench) But sometimes I have silly ideas as it's concrete!!! Very heavy, how would I support it and it wouldn't be very comfortable. So...away it goes. Our contractor ask it he could bury it back in our yard as concrete is incredibly expensive to haul away (very few places take it now). I've told him no you can't bury the extra concrete in our yard....funny the questions you get asked.



This is the spray foam insulation in the attic. Neat stuff, very expensive. But we didn't have to furr out the sloped portions of the ceiling so worth the price.

Saturday, March 28, 2009

FINALLY LIGHT IN THE BASEMENT....

Unfortunately I think we liked it better not being able to see anything. The existings windows in the basement were all covered over with insulation and plastic so it was very dark (still no light). The new windows look good, bit of an issue with the basement windows. Were not sure exactly what happened but the windows are too tall for the opening. Myles and I had very clearly marked on our dwgs that the existings bucks (the wood sills around the window) be replaced. The Gienow installer was just going to put the windows in on the existing bucks but found out they were rotted (hence why we stated replacement!!). So it took them more time but it's not our problem so someone will have to cover those costs and it won't be us. Sometimes the dwgs hurt you and sometimes they help.





Thursday, March 26, 2009

COMING ALONG....

Piles were poured for the new deck today. Our deck is going to be super beefy!! We thought they were crazy for using all that concrete, but Kelowna is a little different than what we're used to in Calgary. In Kelowna you have to put a 3' x 3' x 6" pad footing underneath the piles at a depth of about 3'-0" below grade (maximum depth of frost in Kelowna is about 2'-6"). In Calgary, you can just use a post-hole auger and drill down to about 5'-0" below grade(maximum depth of frost in Calgary is about 4'-0") and pour the concrete into the tube for the post support. The concrete can bear on the undisturbed soils directly. In Kelowna, the soil makeup is very different. There's a lot of sand in it so the soil itself does not have enough bearing capacity to bear the concrete pile directly on undisturbed soil. Hence the requirement for the pad footing. So the deck will be very well anchored into the ground, which is not a bad thing.




New shower base....



New upstairs shower plumbing.



New closet in the upstairs bedroom with insulation and vapour retarder completed. We used the existing sloped attic space for the closet. This is a good use of otherwise unused space, especially in these older homes where storage & closets(in general) are lacking. Thanks to mom Thurlow & Mylo for the idea. The doors will only be 5' tall but that should be alright as the whole inside will be shelving. The small walk in closet that we created on the other side (behind the brick) will be all hanging space, so between the two, hopefully, it will be enough (For Catherine!! I'm sure my clothing will be placed remotely around the house!! -M) Just to the right of the closet we have run power and cable in the wall up high, so we can mount a flat screen TV in the corner. Although the new TV won't be happening right away, it's always a good idea to run future cable while the wall is open.



Note: These are the only pictures we have as when we went back tonight to take more pictures we couldn't get into our house. The new door (which doesn't have it's hardware on yet) was barricaded from the inside and the back deck has been ripped off so you can't reached the back door with out a ladder...... So not sure what happened inside. Guess we will find out tomorrow.

WINDOWS & DOORS

Old windows & Doors....



Without windows, still with old doors......



With new windows and doors......finally!



So we basically replaced the windows with the exact same look as the old wood ones. I would have loved to have replaced them with wood windows but the cost of wood is about twice as expensive. We do have a funky new application on the windows that doesn't cost very much, it's call "Neat glass". Supposedly (at least it's what they say) we will never have to wash the exterior glass of the windows. I have absolutely no idea how it works, I will look into it and pass on the information. So anyone who is thinking of replacing windows can ask us in the next years to come is this was a good add on or not.



The new front door, the color is great, it took us a long time to pick that flesh tone color. Kidding. This is a masonite door, basically a plastic door with a wood grain finish that you can stain (gel stain) to look like wood. It is very nice when completed, although they look pretty horrible until stained. Again a wood door would have been perferrable but the house faces directly south and without any protection the wood have warped and faded eventually. And you can sort of notice but the electrician mounted the new exterior light junction boxes uneven. Guess our house isn't level from the inside to the outside.

And thanks for the all the responses but the general concensus is that it's rhubarb....was hoping for something alitte more exciting....