Sunday, February 15, 2009

MORE DEMO AND OTHER THINGS

Opinions needed.
This old plaster mantle was in the basement and I want to fix it up, paint it and put it in the living room. It also came with an electric log pile that I think lights up??? The wires are so worn I haven't been able to try it but I think that's what it does. Anyways, Mylo doesn't like it and wants to junk it while I think it would look great all repaired and painted white (or brown) really any color other than what it is. Thoughts, views??? (Edit: I didn't realize we were soliciting input from people on what should be kept or not!! If I'd known this, well.....!- M)




Basement
I don't think we had posted any pictures of the basement so here it is.....it's a basement.....spiders and such



The living Room
This is the major structural wall that we are attempting to remove. We have a meeting with an engineer on Monday to find out what sort of beam we will need to remove this wall. Hopefully it won't be to big. And trying to keep the cove of the living room ceiling as well. The construction guys are doing a very good job of trying to keep it. The archway leads to the dining room and kitchen. And the hole in the wall beside the archway will be part of the kitchen area when framing is complete if that makes any sense.

Wednesday, February 11, 2009

END OF DAY 1 - DEMOLITION

I'll I can say is wow!!!




The upstairs



The stairwell is also being opened up. The stairwell wall was constructed of 2x4 on flat, which was odd but isn't supporting anything so doesn't really matter.




Photos of the Living Room wall that is being removed. A structural engineer will be in tomorrow or the next day to review removing this wall, it is load bearing so it will have to have a beam put in. The two demo guys did a very good job of keeping the cove ceiling so that was nice to see. We have discovered that a portion of the brick flue that is being exposed had plaster applied directly on it which is very difficult to remove. I will probably have to spend some time with a small chisel to get the plaster off without destroying the brick....Fun!




Three views of the kitchen. Completely gutted. Only one surprise, for some reason there is no insulation in the exterior kitchen wall, which was a bit of a concern until we realized (we're pretty sure) that it is only the kitchen wall???? But since it has been ripped apart we can easily insulate and vapour barrier. But the wall looks in good condition considering it was never properly constructed.


The garbage bin (which is already half full after one day). Had to take down a portion of our fence to get it in the backyard but better than the front which was the other option.

Tuesday, February 10, 2009

THE BEGINNING

We have a Building Permit, picked our contractor (Impact Builders) and demolition starts tomorrow. WOW!!! Things are going to move along very quickly now. For all our architectural friends it took four days for our BP, definintely a different timeline than Calgary. Construction is to be completed in mid April.

So I've got my camera all charged up and ready to go. The contactor is spending today gearing his crew up and ordering garbage bins which will arrive tomorrow. Due to our limited budget we are not going to be able to do the garage right away, maybe late spring or fall (Edit: So Cath is going to have to deal with the heavy guitars in the house for now!! - M). We have a budget for the house construction, which includes everything on our drawings we didn't have to do any cost savings!!! Well except for some small kitchen modifications, it's so easy to get carried away with kitchens. So we are going ahead with interior/exterior house and then we will see how much is left when that is complete, if any.

We are very excited!!!! Hopefully it will turn out beautiful.

Wednesday, January 28, 2009

MORE PHOTOS....


Unfortunately we can't keep the fir floor in the bathroom there is just too much moisture damage. But that's OK as I had already picked out a tile that would look really cool in a bathroom and I couldn't put it upstairs as it requires a little space. The fir in the kitchen is good though, so we were happy about that. It's just still covered with cardboard from the bottom layer of linoleum (there were two layers, one had asbestos and one didn't).








Mom, I think you mentioned that there weren't any good photos of the kitchen area so I've tried to take a few more. It's nice to have some good 'before' shots as it's not going to look anything like it looks right now.

I took some of these before the asbestos was removed in the kitchen and some after. It's an interesting procedure to remove the asbestos: Two men come in seal the entire area off with duct tape and plasti. Then they suck all the air out of the area with a vacu-hose to create a negative pressure in the space, then rip up the floor and package it into sealed bags and then inject the air with some sort of particulate that hits the airbourne asbestos molecules and cause it to fall to the floor, then they vacuum everything up and it's good to go. I guess the problem with asbestos is the amount of time it remains in the air, that's why it is so nasty. We have some more on the basement ductwork which will be removed when we start to make the changes to the ductwork.

THE PLANS

We have finally finished our design and drawings. We sent drawing sets out to three contractors today and the drawings will be submitted to the City of Kelowna for Building Permit tomorrow. So now Mylo and I cross our fingers that we can afford to do what we designed. Chances are we will have to do some redesign due to budget constraints but hopefully not to much.


Existing Main Floor Plan
As you can see the two main problem with the house was the extremely narrow hallway between the Entry and the Kitchen as well as the actual size of the kitchen.

Existing Upper Level Plan
Nothing much had been done to the second level. Both rooms were very small and it did not have any sort of landing space at the top of the stairs.

New Site Plan
Here is the the new site plan. We are keeping the existing garage/shed on the upper right and adding a new, small 2 car garage on the upper left w/ my jam room. We've also added a new deck off the house which will get a lot of use during the warm summer evenings.
New Main Floor Plan
We have removed the main wall between the Living Room and Entry/Hallway and opened up the stairwell as much as structurally possible. We basically removed the hallway completely using the end of the hallway for the new fridge. The existing back door has been removed and new terrace doors (the same as what we had in Calgary) were added off of the Dining Room. The wall between the Dining Room and Kitchen has been moved and modified to allow for more kitchen area. A brick chimney flue that runs from the basement to the roof has been exposed on both the main and upper levels.

New Upper Floor Plan
We have added a new master ensuite and created a master loft bedroom w/a new walk in closet and closet in the attic space.

So, that's what we're planning. Hopefully it's all in the budget! We're also planning all new windows and doors, new hot water tank, new lighting, refinishing the existing fir flooring and adding new fir hardwood in the bedroom upstairs, new tile in both bathrooms and an air-source heat pump which will provide the majority of the heating for the house until the temperature drops to below -5C and then the furnace will take over and as well will provide cooling so we don't sweat to death in mid-summer! We will be having an energy efficiency audit done on the house in the next week or so and then again when we are finished the reno. Between the Province of BC and the Federal Government, we can get some cash back for installing energy efficient appliances, thermally broken windows and other items which are too numerous to list. BC has many more incentives to be 'green' than Alberta does, so that is working in our benefit.

That is all for now, we'll update again once we get our costing back and let you know when we're starting. Then it will really get exciting as we can show you photos of the demolition and the process of re-creating our new home at 800 Sutherland Avenue.

Cheers,

Cath and Mylo
Enjoy

Thursday, January 22, 2009

Getting Closer

Yo. So we're getting closer to starting this damn thing. Cath has been a busy little bee getting the drawings up to stuff and we're super close now. We're planning to give drawings to the contractors early next week so they can give us a price!! Now we hold our breath and hope we haven't gone too far.

As Cath mentioned in an earlier post, our hand has been forced and we have to build the garage sooner rather than later in order to accommodate the upgraded 200A electrical service to the house. This is not a bad thing. With the garage being built concurrent with the interior reno, I get a place to play my guitars as loud as I want much sooner!! So I'm excited about that!

I've been on the phone with the utilities getting locates done on our incoming services. We'll need to move the gas meter and up-size the meter and regulator to achieve a higher delivery pressure in order to feed the new appliances. The meter will be anchored off the new deck, not the house, which is helpful to us because in it's current location, it doesn't meet code due to the proximity of doors and windows to the regulator. Luckily the incoming gas service runs right between the existing shed and new garage and the secondary from the main will not have to be up-sized. So that will save us some cash. We'll probably need to up-size the piping inside the house, but we'll find out for sure from the gas-fitter.

An all new 200A electrical service will be fed to a panel in the garage with a secondary feeder running to a new panel in the house. We need to up-size in order to accomodate the increased load that the future hot tub and central air conditioner will impose on the system. These are the joys of buying an un-modified 63 year old house. But it's going to be pretty sicky when it's done I think. Cath has done an absolutely amazing job of re-designing the spaces. My input has been pretty minimal, but I need to keep her in line from time to time as she get's some really fancy (read: expensive) ideas sometimes : )

That's all for now. Long winded I know, but now you're up to speed. Once the drawings are done, we'll be posting them on here so everyone can see what the plan is.

P.S. Thanks to everyone for the good wishes and phone calls and such over the holidays while I was in the hospital with an exploded pancreas. I appreciate it. All is good now, feeling good and ready to get on this reno and back in the gym and get ready for an Okanagan spring!!

Mylo

Wednesday, January 7, 2009

HEALTH HICCUP

So hasn't been much news on the renovation front over Christmas. As most of you probably already heard Mylo was admitted to the hospital early AM on Dec. 30th with a pancreatitis attack. The pancreas basically gets really upset and starts oozing jelly like substance into your adominal cavity, enzymes into your stomach and it's really, really painful. I was just reading back on Jenny's blog when she was describing her "surreal" experience in the hospital that is sort of how I feel about poor Mylo's stay. Was definintely the worst hospital experiences I've ever seen (even worst than my own). After nine hours in emergency he was finally admitted, spent a day in a hallway, and then finally got a room, which you would think would be a good thing. It wasn't. Let's just say the other patients in the room were disruptive to say the least. Anyways he's back on home recovering and everything is fine, just a small lifestyle change that's all.

We have finally meet with some contractors. That's always tough, hard to pick. One guy is really big in Kelowna, which I don't know if that's so good for us as we are rather small. But he definintely knew his stuff just that he's probably more expensive. The other fella was very nice, much more willing to work with our own trades or products. Decisions, decisions.

I'm going today to drop off some linoleum for asbestos testing. Let's hoping it's not, not that big of a deal to remove it just more money, which I would rather spend on something else.

And as all renovations do we have already run into our first problem....electrical.
The main service is coming into the house from the lightpost on the main street. There is only one other house on the street that has this issue as well. All the others have been upgaded. Everyone seems to be running off the lines in the alley to either their garages or carriage houses and then into the house. Can't run it directly to the house as Fortis will not allow electrical lines to encroach over roof lines and the future holds a garage. We hadn't planned to do the garage right away but we might have to. Just doesn't make sense not to. Then that lead to other issues, the old garage that is there, which I wanted to keep, might have to be demolished as the bylaw stipulates only one out building per site. So the problems have begun but there is always solutions.