Living Room with framing complete. Plumbing inspection was Monday, we passed. Electrical & Framing inspecton are Friday, hopefully we'll pass but I'm sure we will. Windows are scheduled to arrive tomorrow and will probably start installation Friday. Drywall is scheduled to begin on Monday.

View from the dining room into kitchen. All framing is complete, the housing for the pot lights are in. Just waiting for HVAC, there is alittle bit of ducting to run upstairs.

Upstairs bedroom looking towards bathroom.

New clawfoot tub in upstairs bathroom. Had to be put in the bathroom right now as it wouldn't have fit through the existing door. Pain in the butt for the tile guy but unfortunately nothing we could do about it. Tub was installed incorrectly the first time but Mylo and I caught it and now it is in the correct position. We spent alot of time laying out the upstairs bathroom very carefully, as it is so small. But every single fixture had to move a couple of inches due to the location of the floor drains and the existing floor joist locations. But I think we worked it all out. One of those frustrating things you just can't control. Mylo and I also added in floor heating today to this bathroom. We were at a party on the weekend and someone had it installed in their kitchen and it was wonderful so we added it. Basically we are looking at our budget as what can wait can wait and what we won't be able to do afterwards we do now. We would never be able to add it later.


Even cuter!!!
That is a serious handful of cuteness!
ReplyDelete( and your tub is pretty sweet too)- The house is really coming together, I can see the vision now! Your master looks so nice and I love the arch in the living room.
I echo Jenny's comments. Oh my!
ReplyDelete