Monday, March 16, 2009

RESTORATION

Wall Mounted Sink




These are the original sink legs for the wall mounted sink in the main floor bathroom. I decided to re-use the existing sink as it was in good condition, I liked the retro look of the legs and towel bars and, most importantly, it fit well in such a small space. But, unfortunately one of the legs was bent so I did a bunch of searching on the internet and managed to find a site on restoring old retro style bathrooms, called "Save the pink bathroom" www.savethepinkbathrooms.com, which lead to www.retrorenovation.com, another cool blog. It has some information on where to purchase sink legs and they were only $25.00....wow hey! Not so..... I also needed to buy a corner shower curtain rod. A straight shower curtain would run straight into the window so it had to bend and return back to the wall. So I find this strange shower curtain at the same site that I found the legs, for only $90.00!! (kay, that's a bit expensive for a shower curtain rod but we had no choice). Anyways so I ordered it and wasn't really paying attention. What started as $135.00 worth of product eventually cost us $450.00 (shipping, duty, the dollar!!). Let's just say that I'm not allowed to order anymore strange products from the US anymore. But I have sink legs!!! But it's not over yet, I was simply going to use the existing side towel bars and had put them aside in one of the bedrooms and a grommet for one of the arms fell off and the guys (while cleaning) must have swept it up. And I can't find these towel arms anywhere. So I was alittle perturbed, my own fault for not getting them out of the house. But I have come up with a solution, I am going to use a portion of the old sink legs, which seems to work, not perfect but it will work. I hope.

Door Hardware



Here's my next issue. Replacing the door hardware or replacing the doors. The house has some beautiful wood doors, that match the fir floors that we would like to keep. The hardware is very old though. Two of them still have their keys as well. I have managed to find a site (in Canada this time, again, not allowed to order anything from the States!!) but it will still cost about $150.00/door.

But if we don't replace the hardware we have to replace the doors, which are all strange custom sizes. So, decisions, decisions. We will probably order the hardware, it would look really nice. I will order one first (shipping is very reasonable) and see if it works but from what dimensions we have it looks like they will fit.

IT'S OFFICIAL - WE'RE BEHIND SCHEDULE

So it finally happened we are officially behind schedule by at least 1 week, maybe closer to 2. A couple of things have happened that were beyond our control. First of all, HVAC....ahhhh, HVAC. Of all the things to be so complicated on a job. We took so long debating what to do about the heat pump vs. a high efficiency furnace that we sort of forgot about all the ductwork that is required to go along with that and of course they can't drywall until the ductwork is in. As well, the scope is much larger than we originally anticipated. Oops. We didn't realize that they need to change all our supply air ducts (on the main floor) to return air ducts and all the return air ducts to supply air ducts????? Silly, I know. In 1946 they put the heat registers on the inside of the house and the return air on the perimeters. Standard bldg. practice (by code) is the other way around. We should have looked at the HVAC system the same way we looked at the electrical and plumbing, replace the whole thing. So the mechanical contractor started Friday and will probably be a week. Secondly, and on a sadder note, our contractor's grandmother passed away so he is gone all this week in Manitoba. Impact (our builder) is a family run business by three brothers and one sister so the whole company is gone!!!!!
So no new pictures as HVAC is really not all that important....kay, I know it's important, all that heating & cooling, but it's just not interesting in pictures.
But on a good note, windows are suppose to be arriving anyday.....and they can probably start putting those in right away.

Wednesday, March 11, 2009

FRAMING COMPLETE!

This is the backyard right now.....what a mess!!! And we have a puppy coming in 7 weeks but we will be ready!! Hopefully!!


Living Room with framing complete. Plumbing inspection was Monday, we passed. Electrical & Framing inspecton are Friday, hopefully we'll pass but I'm sure we will. Windows are scheduled to arrive tomorrow and will probably start installation Friday. Drywall is scheduled to begin on Monday.


View from the dining room into kitchen. All framing is complete, the housing for the pot lights are in. Just waiting for HVAC, there is alittle bit of ducting to run upstairs.


Upstairs bedroom looking towards bathroom.


New clawfoot tub in upstairs bathroom. Had to be put in the bathroom right now as it wouldn't have fit through the existing door. Pain in the butt for the tile guy but unfortunately nothing we could do about it. Tub was installed incorrectly the first time but Mylo and I caught it and now it is in the correct position. We spent alot of time laying out the upstairs bathroom very carefully, as it is so small. But every single fixture had to move a couple of inches due to the location of the floor drains and the existing floor joist locations. But I think we worked it all out. One of those frustrating things you just can't control. Mylo and I also added in floor heating today to this bathroom. We were at a party on the weekend and someone had it installed in their kitchen and it was wonderful so we added it. Basically we are looking at our budget as what can wait can wait and what we won't be able to do afterwards we do now. We would never be able to add it later.



So cute!!!

Even cuter!!!

Friday, March 6, 2009

CONSTRUCTION CONTINUES.....

So cute, just had to add this in, even though it doesn't have anything to do with the house. Pups were born @ 2:30am this morning, all 11 (unfortunately 2 passed away) so all 9 of them!!!! Mylo and I will get to see them at the end of next week.
For those who don't know what I'm talking about this is our new puppy, well probably not the exact one but one of his sisters/brothers.



Old electrical panel on the left, new electrical panel on the right. Wow, that's a big panel. We moved the electrical to the other side of the basement so there are only two lights still attached to the old panel (both downstairs) so no lighting upstairs and for a couple of days no heat as well. Don't know when they are planning to hook up new panel, wires everywhere!!!



The beam is in. You can now start to see how open the Living Room/Stairwell is. Really helped the space feel bigger. I have added an older picture taken from the same spot to get a feel for the space. Both Mylo and I really thought that when they put the beam in they wouldn't be able to save the cove ceiling on the living room side, but they did. I think our framer is alittle shocked as well. They had to brace the entire cove along the wall, if it was going to come down it would have come down in one whole peice, that's how strong it was. It has a few cracks but that's it, pretty good for stuffing plumbing and a 2X12 2-ply beam behind it. Impressive.



Three pictures of the stairwell:
Left (2 weeks ago) Still shows the old hallway (the scary narrow one)
Middle (1 weeks ago) Framing in, hallway gone. The fridge is going on the other side of that new framing wall at the end of what the hallway use to be.
Right (today) The beam is in and wall is gone.



Kitchen as of today (photo below)....



Kitchen 2 weeks ago (photo below).....



Kitchen looking towards Dining Room

Friday, February 27, 2009

THE END OF DEMO (HOPEFULLY)

So hopefully the asbestos will be removed tomorrow. Once those two ducts are removed the framing can begin, the electrician can finish and the plumber can finish.




This is the upstairs looking each direction, alot of the plumbing is already in, only the shower is waiting due to the asbestos. You can also see the new closet is framed into the existing attic space (right side of first photo). We ran into a problem trying ot figure out how to get the shower drain down into the basement (it's directly beside the angled portion, right-center of first picture), it's a 2" pipe and they didn't want to drill through our 2x8 floor joists. Our contractor came up with a great idea and we are going to run it under the framing of the cove ceiling right above the new beam. I don't know if that makes sense but it's a very interesting solution. The other option was lowering the floor in the entry way which we didn't want to do.



Living Room
This is one of the major walls (left side of the photo) that is being removed but awaiting asbestos. You can see the duct running up inbetween the studs. So this wall will probably come down on Monday and the new beam will be installed.



Picture from Dining Room into Kitchen, showing the new wall. There is also part of the existing wall between the kitchen and dining room that hasn't been removed yet again due to asbestos and will probably be gone on Monday.
We decided to remove the ceiling in the kitchen, we had to exposed most of it from above in order to reinforce the splice on the floor joists that was right over the existing kitchen/dining room that we wanted removed. So taking up all the floor boards upstairs cracked a bit of the plaster in the kitchen so it was worth the price of drywall to remove. But it also means that they could take out all the sawdust therefore we can have pot lights in the kitchen again. We had originally shown pot lights but the electrician wouldn't install them with all the sawdust that was inbetween the floor joists, which we agreed with. So we changed to track (which we didn't like as much). But now we are back to pot lights. But that's good.

Friday, February 20, 2009

SMACKDOWN (HEAT PUMP VS FURNACE)

So this might be a really boring blog for some, but thought I would stick in some information regarding the mechanical & electrical and dealing with the inspectors and engineers. Not very exciting I know, but these are the areas causing the most grief right now.
Topic 1 - HVAC (Heating, Ventilation & Air Conditioning):
I will try to be as clear as possible but I'm still a little confused by all of this so see if you can figure it out.
Myles and I bought a house with a 10 year old furnace (mid-efficiency Lennox, still has a good fifteen years in it)and wanted to add some cooling to the house but not with the window units. So we started looking at central air conditioning. Then someone mentioned to us this thing called a heat pump, which being from Calgary, we had never heard of. It provides heating (to -4 or so) and cooling in the summer. Therefore, we thought, what a good idea, let's take some of the weight off the older furnace and reduce our gas consumption for fall and spring and have cooling in the summer as well! Also, it qualifies for provincial and federal rebates through the LiveSmart BC and Federal EcoEnergy programs. Perfect. Well, not so simple. First contractor tells us the way to go is with a new high efficiency furnace and is pushing, pushing, pushing for that. Well we didn't hire him. First HVAC guy tells me that the heat pump is the way to go, would be perfect for the existing system and that we would get full rebates. He supplies Trane which is a good brand but very expensive. Energy guy (came in to do the initial energy efficiency audit for the rebates) told me that the heat pump would be perfect for our existing system and that we would be eligible for both rebates. Second HVAC guy tells us we can't add a heat pump to our existing furnace as it needs a variable speed fan?? And that the way to go is a high efficiency furnace (and he supplies Armstrong Air, which is the builder grade of Lennox - substantially cheaper than Lennox, but many of the same components). So we did some research on this.(thanks Brad and Doug Anderson for the input!) and everyone we talked to loves their heat pump and that we can add it to our existing furnace, no problem. So we decide to ignore second HVAC guy and get a heat pump. Then we receive a note from first HVAC guy who tells us that he is sorry, but if we install a heat pump we will not be eligible for the provincial rebate because of low energy rating of our existing furnace and the lack of a variable speed fan. Apparently in January 2009 the government has revised the criteria for obataining the rebates to be based on 'whole system ratings' instead of individual compenents (very confusing and the suppliers are just finding out about this now!!) So there we are. All Myles and I have to say is "WTF"??? We are still trying to work this out.
I think we have decided to go with second HVAC guy (Armstrong)get a new, high-efficiency furnace and heat pump (to get the full rebate for the heat pump, which is the greater of the two) and the whole system is done and done and it's the pimpin' system. Oh, I forgot to mention that you also receive a good size rebate for a hi-eff. furnace as well but you don't get it for both if you put in a heat pump and hi-eff. furnace.
Topic 2: Electrical
The existing electrical service comes into the house from the front street overhead from the lamppost, not an ideal situation or very aesethetic looking. We wanted it to come in overhead at the rear. Met with Fortis BC (the electrical utility), on site yesterday. He took one look at our situation and told us that it would have to come in underground at the front and couldn't go to the back. That was that. So that means digging up our front lawn and part of the existing sidewalk that we were not going to touch. I argued and argued but got no where. Then he found out that they would have to pull the primary service approx. 100m from the transformer location, to get to the house, so all of a sudden they reconsider. Just like that. So now it is coming in overhead right down the middle of the property (but it's really high) to a mast and then a big conduit running down the back of the house to a large meter. But it's in the back....so I guess that all worked out?????
Topic 3: Inspectors
Well I've already discussed electrical inspector but we also had a meeting with our building inspector. We needed to discuss the existing stairs to the basement which we want to make steeper (they wouldn't meet Building Code then) so there's more head room clearance. On our Building Permit drawings they told us we couldn't do it. Secondly the existing window in the upstairs bedroom doesn't meet code exiting requirements. We didn't want to buy the windows and then have the inspector make us rip it out and put in a new one, they can do that!! I don't like inspectors (I purposely wasn't there for that meeting as I get all ramped up). Well he saw the window and is making us make it bigger but, oh well, as least we know now and can order the right window. And the stairs, which we thought would be an issue he took one look at and told Mylo to do anything he wanted, 'use a rope as a handrail if you want', he doesn't care. But what he did care about was the existing roof insulation. We are not ripping down the exiting ceiling drywall on purpose, we're not touching any of the existing sawdust or cellulose insulation up there. Well he didn't like that. He wanted R30 (but 'compromised' down to R20) insulation, which would mean (1) furring out the ceiling 2" and putting in batt insulation (cheaper version) or ripping down the existing drywall and apply sprayed polyurethane foam (more expensive version) but we don't have to lower the ceiling. If we lower the ceiling the door of the bathroom doesn't fit. So we are going the high road, of course. We didn't see this one coming at all. And Mylo (bless his heart) even found a clause in the Building Code that says we aren't required to do this, if we wanted to battle him on it. But we're picking our battles, this is probably a good thing to do, it will reduce ice-damming on our roof, better for the whole house really. Corey will be happy that were doing it!!
Topic 4: Engineer
Everything went fine, we can do everything we want to do in the house. We had to get a couple of beams engineered due to the loads imposed from above, but it's all good.
(That was surprising)
Oh one more
Topic 5: Asbestos
We had priced out having 5 existing ducts in the basement removed due to asbestos tape on the joints. But after the plaster was removed, we found out that two of the ducts going up to the second floor, which we are relocating are both completely wrapped in asbestos tape from the basement to the second floor!! So everything is on hold until the asbestos can be removed. Nothing, absolutely nothing is happening at the house right now!! Sucks.
The asbestos removal people have put us in the schedule and will phone the day before to say they are coming in. They have told us next week.
Oh I could talk about gas too but I'm not going to.
Oh the problems, but they all get settled and actually everything is going as smoothly as can be expected. That is all for now.

Sunday, February 15, 2009

POST FOR MOM THURLOW

This posting is for mom Thurlow. Pictures of the crate that I found in the crawl space that I was telling you about and the grape vines.



Here are the grape vines, thought it would just be easier to upload them to the blog instead of emailing them to you.
This first picture is of all the vines. This is from the back of the house, they run along the East side.


Vine 1, this is the one that is growing up the plum tree.


Vine 2


Vine 3 (this seems to the biggest one)


Close up of the grapes


This is the one growing up the plum tree.


View from the front of the house.